Hi
We are about to start up with UPL. During the period we will be logging, our Solution Manager system will be down for upgrade for a few days. Question is: How do we make sure that data collected in our Statistic system during this upgrade, are transferred to Solution Manager afterwards?
UPL data will not be purged until after 14 days (default) on the statistic system. I assume that when the job starts again (when Solution Manager is upgraded), all statistic data from the previous days will be transferred. But assuming is not enough. I need to see that it is stated somewhere that if transfer job between Statistic system and SolMan is "paused" for some days, data from these dates will still be transferred.
Can someone help me clarifying this?
Thank you
regards Ole